Project: Asokoro 1: 17m High Retaining Wall under construction.
Project: Asokoro 1: 17m High Retaining Wall under construction.
Project: Asokoro 2: Basement Retaining Wall Foundation under construction.
Project: Asokoro 1: Underground Squash Court under construction.
Project: Construction of SPDC Osubi Airstrip Phase 1 & 2 Development Main Contractor: Julius Berger Nigeria Plc Employer/Owner: SPDC Project Status: Completed. Scope of Work: Phase 1: Site Clearance and Bush Cutting. Excavation Works Dredging/Mebra Drain/Monitoring/Preload Apron Construction Runways &Stopways Taxiways Fuel Farm and Refueling System Drainage System/Drainage Ponds/Stormwater Drainage Scheme (Phase 1) Phase 1 […]
Project: Upgrade of Yola Airport to B727/B707 Standards in Yola Adamawa. Main Contractor: Julius Berger Nigeria plc Employer/Owner: Federal Ministry of Aviation Project Status: Completed. Scope of Work: Removal of the existing failed Asphalt Surface. Widen of the existing Runway from 30m to 45m and also increasing the length from 2.5km to 3.5km. Construction of […]
Project: Rehabilitation of Yola – Mararaba – Mubi – Michika Road Project and Construction of Kudzum Bridge. Main Contractor: Julius Berger Nigeria Plc Employer/Owner: Federal Ministry of Works Project Status: Completed. Scope of Work: The works consist of 101km length of road. It also involves the construction of one (1 No.) Bridge at Kudzum. […]
Project: Upgrade of Bauchi – Gombe – Ashaka Rail Line Project. Main Contractor: Julius Berger Nigeria Plc Employer/Owner: Federal Ministry of Transportation. Project Status: Completed Scope of Work: Construction of Rail Bridge Protection of Embankments Drainage Works Re-direction of Stormwater Channelization of the Basin
Project: Rehabilitation of Jos – Bauchi Road Project Main Contractor: Julius Berger Nigeria Plc Employer/Owner: Federal Ministry of Works and Housing. Project Status: Completed. Scope of Work: The works consist of the rehabilitation of 85km length of road. The road was reconstructed to a 7.3m wide of Asphaltic Concrete dual carriageway separated by reinforced concrete […]
Project: Rehabilitation of Yola Township Roads Main Contractor: Julius Berger Nigeria Plc Employer/Owner: Adamawa State Government Project Status: Completed and Handed over. Scope of Work: The works consist of the reconstruction of 3.5km length of road. It also involves the protection of existing box culverts. The road was reconstructed to a 7.3m wide of Asphaltic […]
Project: Construction of Phase 1 Road Network for ABTI University and Development of 5No Buildings. Main Contractor: Julius Berger Nigeria Plc Employer/Owner: Federal Ministry of Transportation Project Status: Completed. Scope of Work: Construction of the Road Network within the University