Project: Rehabilitation of Yola Township Roads
Main Contractor: Julius Berger Nigeria Plc
Employer/Owner: Adamawa State Government
Project Status: Completed and Handed over.
Scope of Work:
The works consist of the reconstruction of 3.5km length of road. It also involves the protection of existing box culverts. The road was reconstructed to a 7.3m wide of Asphaltic Concrete dual Carriageway separated by reinforced concrete barriers with a 2.75m wide asphalt finished shoulders with provision of 200mm sub-base and 200mm crushed stone base, 60mm and 40mm Asphaltic Binder and Wearing Courses respectively.
Other works include drainage structures, extension of existing culverts, kilometer posts, road signs and markings etc.