Construction of a Lecture Theatre for the Faculty of Basic Medical Sciences (500 Capacity) at Ambrose Alli University Ekpoma
Project: Construction of a Lecture Theatre for the Faculty of Basic Medical Sciences (500 Capacity) at Ambrose Alli University Ekpoma
Construction of a Residential Building at Asokoro 1 Abuja (Basement Floor Foundation/Swimming Pool)
Project: Construction of a Residential Building at Asokoro 1 Abuja (Basement Floor Foundation/Swimming Pool)
Developed Residential Villa at Agbara Estate, Lagos
Project: Developed Residential Villa at Agbara Estate, Lagos
Asokoro 2: Basement Foundation Layout under construction
Project: Asokoro 2: Basement Foundation Layout under construction.
Uyo Villa (Main Building) 2nd Floor Filigram Slab under construction
Project: Uyo Villa (Main Building) 2nd Floor Filigram Slab under construction
17m High Retaining Wall under construction
Project: Asokoro 1: 17m High Retaining Wall under construction.
Basement Retaining Wall Foundation under construction
Project: Asokoro 2: Basement Retaining Wall Foundation under construction.
Asokoro 1: Underground Squash Court under construction
Project: Asokoro 1: Underground Squash Court under construction.
Construction of SPDC Osubi Airstrip
Project: Construction of SPDC Osubi Airstrip Phase 1 & 2 Development Main Contractor: Julius Berger Nigeria Plc Employer/Owner: SPDC Project Status: Completed. Scope of Work: Phase 1: Site Clearance and Bush Cutting. Excavation Works Dredging/Mebra Drain/Monitoring/Preload Apron Construction Runways &Stopways Taxiways Fuel Farm and Refueling System Drainage System/Drainage Ponds/Stormwater Drainage Scheme (Phase 1) Phase 1 […]