Project: Dualization of East-West Road Section II from Kiama – Port Harcourt.
Main Contractor: Julius Berger Nigeria Plc
Employer/Owner: Federal Ministry of Transportation
Project Status: Suspended.
Scope of Work:
The project starts at the junction with PH – Aba Expressway (Eleme Junction) in the north east of Port Harcourt and proceeds towards east within Port Harcourt Town, passing Ahoada, Mbiama and ends at Kiama at River Num. the length of the project is approximately 101km.
The road was reconstructed to a 7.3m wide of Asphaltic Concrete dual Carriageway separated by reinforced concrete barriers with a 2.75m wide surface-dressed outer shoulder and 1.5m wide inner shoulders with provision of 200mm sub-base and 200mm crushed stone base, 60mm and 40mm Asphaltic Binder and Wearing Courses respectively.
There are 12 number Bridges at various locations.
Other works include drainage structures, extension of existing culverts, kilometer posts, road signs and markings etc.