Construction of SPDC Osubi Airstrip

Project: Construction of SPDC Osubi Airstrip

Phase 1 & 2 Development

Main Contractor: Julius Berger Nigeria Plc

Employer/Owner: SPDC

Project Status: Completed.

Scope of Work:

Phase 1:

  • Site Clearance and Bush Cutting.
  • Excavation Works
  • Dredging/Mebra Drain/Monitoring/Preload
  • Apron Construction
  • Runways &Stopways
  • Taxiways
  • Fuel Farm and Refueling System
  • Drainage System/Drainage Ponds/Stormwater Drainage Scheme (Phase 1)
  • Phase 1 Car Park
  • Main Access Road, Fuel Farm Access, Landside & Airside Access Roads & Perimeter Road
  • Fire Shed/Station
  • Gate House & watch Towers.
  • ILS Installation, NDB, DME & Navigational Aids
  • Lighting for Roads, Car Park, Apron etc.
  • Provision of Water Bore-hole & Distribution to Temporary Terminal Building
  • Warning Light Beacons
  • Boundary markers
  • Oil Skimmers/Interceptors
  • Soil Improvement (installation of wickdrains, completion of pre-load,

installation of monitoring of settlementinstrumentation, removal of pre-load)

  • Sand-Stockpilefor futuredevelopment
  • Airfield Light Conduits
  •  

Phase – 2

  • Power House/NEPA intake & Electrical System Development
  • Parallel taxiway, Road Works and Helipads

Welded Mesh Fence (Citadel) installation.