Ajaokuta – Warri Rail Line

Project: Completion of Ajaokuta – Warri Rail Line
Main Contractor: Julius Berger Nigeria Plc
Employer/Owner: Federal Ministry of Transportation
Project Status: Emabel Service to JBN ended

SCOPE OF WORK:
The works comprise of the following: earthworks, clearing and shrubbing, excavation and embankment. Construction of Sub-ballast, Sub-Base, Base and surfacing.

Provision of concrete kerbstones, verge galvanized steel standard guard rail.
Bridge works include the earthworks and the Abutment, Piers, Decks and miscellaneous works.

Culverts (Box Culverts and Underpasses), Pipe Culverts, Retaining walls, Drains and Protection works.

Permanent Way (Railway Works) includes but not limited to the supply and installation of Manual switches, ballast material, concrete sleepers, flange grove, welded track and various components, sundry works like metallic stakes,
Supply and erection of buffer stops, stabling limit signs, kilometer posts and Hectometric posts. Supply and install precast railway crossing slabs, slope change posts, railway sign boards and demarcation posts.